Moving mountains

Challenged all the way to completion, the Kathmandu store at Hay Street Mall had more twists and turns than Philip Island raceway.

The existing roof required structural repairs and the flooring had over 100mm thick of different materials applied over the past century.

With any older structure, we unfortunately found asbestos. All the asbestos was removed, the new flooring was installed, including over 200sqm of a new concrete slab to the front area.

All brick walls were sealed to stop them from breaking down, the installation of a new disabled toilet and finally new fire doors were added to the four stories to keep in code.

We would like to thank the Kathmandu, APP, Ramvek and all our contractors for their patience and support through this fit out.